Boonton Township adopts the state septic standards and then adds its own, stricter rules in Chapter 170 of the township code. If you are repairing, replacing or buying a house with a septic system here, these are the rules that shape the job.
The Boonton Township septic code is Chapter 170, adopted by the Board of Health in 1990 on top of the state's individual sewage disposal standards. It requires two equal tanks in series, a reserve area for new homes and a Board of Health permit for any repair or replacement. Violations carry fines of $25 to $500 per day.
Chapter 170 was adopted by the Board of Health in 1990 and adopts the state's individual subsurface sewage disposal standards. Under section 170-6, no septic system may be repaired or replaced without a Board of Health permit. Applications are filed on Board forms, one per installation, and a professional engineer must certify that the system complies with state rules, the approved design and the township's higher standards. The Board may send an application to the Township Engineer for review.
Permits generally expire six months after they are issued. A permit for a new construction system lasts 12 months, or two years once construction starts, and can be renewed once for no more than six months.

Every new system needs at least two septic tanks of equal size in series. For single-family homes built after the chapter took effect, the plot plan must show a reserve area equal to 100 percent of the disposal field, marked for future expansion or replacement. Soil logs and percolation tests must be done in the presence of the Board's sanitarian or authorized agent, and unwitnessed permeability reports need a chain of custody and an engineer's seal. Test results are good for two years and can be extended.
Installed components must be inspected and certified before they are covered. Burying a line before the inspection is a violation that can cost time and money to uncover.
Section 170-2 bars a new individual septic system where sanitary sewer is available, defined as a sewer within 200 feet of the property line, or one the building can connect to without extending the main, as long as capacity exists. Connecting to another town's sewer needs Board of Health approval. Since only about 271 acres of the township are in a sewer service area, most owners will never face this, but lower-lying properties near the sewered area should ask before designing a new field.
Violations carry fines of $25 to $500, and each day a violation continues counts separately. The sanitarian cannot grant exceptions. The Board can waive requirements for good cause, but not below state standards, and the applicant must notify owners within 200 feet before the hearing.
Chapter 170 does not set a pumping schedule. The township's Highlands plan lists a septic system management and maintenance plan as a required initiative, so pumping rules could come later. For now, septic tank pumping every two to three years, with both tanks checked, is sensible practice.
Most permits expire six months after they are issued, so schedule the work promptly once the permit is in hand.
No. Only the Board of Health can waive township requirements, by resolution, for good cause, and never below state standards. Neighbors within 200 feet must be notified before the hearing.
The current septic chapter does not set a pumping interval, though the township's Highlands plan calls for a septic management and maintenance plan. Check with the Board of Health for any update.
Rules change. Confirm the current requirements with Boonton Township or the contractor before work starts.